Asta Powerproject Version 11 is expected in December 2009 with improvements designed to handle the business challenges that face construction project management today. Improvements have been included based on following up on continuous development and the integration of user feedback.
At a glance — the top 5 new features:
With $6M in revenues and a $10M backlog, Catalyst needed a way
to manage six or eight large projects with a shoestring staff.. Download the case study on Catalyst to find out how.
A case study how to use TILOS in pipeline industry for scheduling and controlling construction works.
CaseStudy-Catalyst.pdf
Adobe Acrobat Document
843KB
Download
Linear Planning in pipeline.pdf
Adobe Acrobat Document
468KB
Download
What's-new-in-AstaPowerproject-V11.pdf
Adobe Acrobat Document
2MB
Download